APC CM Series Bedienungsanleitung Seite 38

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 73
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 37
APC NetworkAIR CM Series: Guide Specifications 33
Steam generating canister humidifier. The environmental control system
shall be equipped with canister type steam generating humidifier. The
humidifier shall be complete with; disposable canister, drain valve, fill valve,
steam supply hose, steam distributor, and automatic electronics controls. The
electronic controls shall maintain full humidifier output capacity during the
life cycle of the canister and have an LED indicating the need to replace the
canister. The humidifier shall have a capacity of ______ lbs./h. (_____ g/s).
Electric reheat. The environmental control system shall be equipped with
electric reheat. The reheat section shall be sized to maintain temperature
control during the dehumidification cycle. The reheat section shall include
reheat elements and safety switches as prescribed by a NRTL. The capacity
of reheat shall be _____ MBH (______ kW) and be controlled in _____ (1 or
2) stages.
Hot water reheat. The environmental control system shall be equipped
with hot water reheat. The reheat section shall include a copper tube/
aluminum fin hot water coil and 2-way on/off solenoid valve. The capacity of
reheat shall be _____ MBH (_____ kW) based on an entering hot water
supply of _____ ° F (_____° C) with a flow rate of _____ GPM (_____ L/s)
and a maximum pressure drop of _____ PSI (_____ kPa).
SCR electric reheat. The environmental control system shall be equipped
with electric reheat. The reheat capacity shall be proportionally controlled via
a SCR (Silicon Controlled Rectifier) controller. The unit microprocessor
shall provide the proportional signal to dictate a variable heater output. The
capacity of reheat shall be _______ MBH (_____ kW).
Hot gas reheat. The environmental control system shall be equipped with
Hot Gas Reheat. The reheat section shall include a copper tube/aluminum fin
hot gas reheat coil and heat reclaim valve. The capacity of reheat shall be
_______ MBH (______ kW).
Hot gas bypass. The environmental control system shall be equipped with
Hot Gas Bypass to provide evaporator freeze protection and reduced cooling
capacity during low load conditions.
Disconnect switch, fused (ship loose). A fused disconnect switch,
complete with fuses, shall ship loose for field installation.
Disconnect switch, non-fused (factory installed). A non-fused
disconnect switch shall be factory installed.
Disconnect switch, non-fused (ship loose). A non-fused disconnect
switch shall ship loose for field installation.
Circuit breaker (ship loose). A circuit breaker shall ship loose for field
installation.
Remote temperature/humidity sensor. The temperature/Humidity sensor
shall ship loose for wall-mounting. The sensor shall ship complete with a 30'
(9.1 m) interconnection cable.
Firestat. A firestat shall ship loose for field installation into ductwork with
the sensing element within the ductwork. Upon sensing of an adjustable high
temperature, the unit shall shut-down. If equipped with a microprocessor, an
audible and visual alarm shall be activated at the microprocessor display/
keypad.
Seitenansicht 37
1 2 ... 33 34 35 36 37 38 39 40 41 42 43 ... 72 73

Kommentare zu diesen Handbüchern

Keine Kommentare